Skip to main content
The same set of tasks can be laid out four ways, filtered down with the query bar, and kept as a saved view in the sidebar. This page is the reference for those controls; what the tasks themselves mean is in Task statuses.

The four layouts

Switch layouts from the selector in the header (Switch task view) on the Tasks page or a project’s page. A project keeps every layout scoped to its own tasks. Your choice is remembered per workspace. ?layout=calendar or ?layout=gantt deep-links a layout directly.

List

  • The top of the list is In Progress: one lane with a tab per person. The open tab shows that person’s running and waiting work, with Cogno’s own work in a warm Cogno group; a run with no owner files under Unassigned. When the names no longer fit, the tabs that are not open show only their avatar.
  • Every status section is always drawn, empty or not, and headings carry no counts.
  • Status sections follow: In Review → Ready → Backlog, then Done when the filter includes it. Cogno-controlled Ready Tasks sit in a nested Cogno group inside Ready.
  • Columns default to the task, Assignees, and Due; Status, Subtasks, Source, Created, and Project exist as additional columns.
  • Drag a row onto another section to change its status, or onto a person’s tab in In Progress to start a run for them. To act on several rows at once, use Bulk edit — see Edit several tasks at once.
  • While you drag, nothing in the list moves: a white outline marks the section the row would land in, a white rule marks the slot in its own section, and a chip with the title follows the pointer.

Board

  • Columns follow Backlog → Ready → In Progress → In Review → Done; the Done, Archived, and Rejected columns start hidden and can be shown from the board’s status visibility control.
  • A second control groups columns by Status, User, or Project; the grouping is remembered per workspace. User columns show human members’ avatars and Task counts; Tasks assigned only to Cogno appear under Unassigned rather than in an empty Cogno column.
  • Cogno-controlled Tasks collect in a collapsible warm Cogno group at the top of every column, including User and Project groupings. Status remains their placement rule; proposal metadata adds no second divider or order.
  • In the Status grouping, drag a card to change its status or reorder it. As in List, the source stays in place in gray, a title chip follows the pointer, a white outline marks a different target column, and a white rule marks a slot in the source column. The source column is not outlined.
  • In the User grouping, drag a card to another person’s column to change its primary assignee, or to Unassigned to clear its assignees. Existing collaborators other than the one you moved remain in their columns. The target column gets the same outline, while the source column stays neutral. Tasks tied to an environment cannot move to a different owner.
  • A drop alone cannot put a resting Task into In Progress. Start its run from the Task so the status and run begin together.
  • The + on a column header (Add task to <status>) creates directly into that column.
  • On desktop, the board stays inside the available window. Long columns scroll independently while the query and view controls remain in place.

Calendar

  • Month and week events use the same compact Task marks as List: status, execution, child relationship, Cogno ownership, and assignee avatars.
  • Calendar surfaces stay neutral. Status appears as the shared small marker; Cogno-controlled Tasks use the same warm surface as the List’s Cogno group.
  • Year view keeps dates neutral and places up to three status markers under a date. Select a date to open its week.
  • Drag a Task to another date to change its due date.
  • Calendar layouts stay inside the available desktop window. The desktop year view fits all 12 months in a four-by-three grid without an inner scrollbar; long week content can scroll inside the calendar.

Gantt

  • Scheduled Tasks show a neutral timeline bar with the same status, execution, child, Cogno, and assignee marks as List.
  • Tasks without a complete date span stay under Unscheduled. Those entries use the regular List Task row, including status, due date, and assignee metadata. Cogno-controlled entries collect in the same collapsible warm Cogno group used by List and Board.
  • Drag an unscheduled Task onto a project timeline to schedule it. Drag or resize a scheduled bar to change its date span; holding it near either horizontal edge scrolls the timeline.
  • On desktop, the timeline and Unscheduled list have separate scroll areas, so scrolling one never moves the other. The query and view controls remain in place.

Edit several tasks at once

Bulk edit in the header turns the list into a picker: a checkbox on every row, and a bar at the bottom holding the operations. The toggle appears in the List layout; a project’s own task list carries the same toggle beside its filter.
1

Turn on Bulk edit

Press Bulk edit. Every row grows a checkbox at its leading edge, and clicking a row ticks it instead of opening it.
2

Tick the rows you want

Shift-click a row to tick everything between it and the last row you ticked. Select all ticks every row on screen; Clear unticks them all.
3

Run one operation on the set

The bar reads N selected. Open Actions and pick what to change — it applies to every ticked task.
Status and Project show what the selection already carries: a check when every ticked task shares it, a dash when only some do. The date button reads Mixed when the ticked tasks disagree. Assignees stay per-task and are not in the batch list. The close button (Leave bulk edit) ends the mode and drops the ticks, as does switching layout or leaving the page. Every operation here is a write, so the toggle appears only for members who can edit content — a viewer is not offered it.
Shift-clicking rows selects them without turning bulk edit on — bulk edit is the visible way to the same selection. On a project’s task list, dragging any selected row then carries the whole set to the section you drop it on.

The query bar

The query bar above the tasks filters and searches the current view. It takes whitespace-separated key:value tokens plus free text; comma-separated values inside one token are OR’d — status:backlog,ready matches either. You don’t have to type tokens: the Filters panel builds the same query as you pick Status, Tag, Project, Assignee, Start, and Due. The default query shows the four open statuses — status:backlog,ready,in_progress,in_review — and your filter is remembered per workspace.

Saved views

Selecting an already selected saved view keeps that view open. To leave it, select All tasks or another destination in the sidebar. A filter you use often can live in the sidebar’s Views section. All tasks is the pinned entry at its top — every task across projects, always.
  • Create — filter the list down, then choose Save as view in the filter panel. The dialog (Create view) takes a View name, an Icon, and a Scope: Personal (Only you can access it) or Workspace (Everyone in this workspace can access it).
  • Edit — with a saved view open, changing its filter surfaces Save in the header to write the change back, Save as new view to branch it, and Reset to return to the view’s saved query. The edit dialog also changes the name, scope, or icon, including Make workspace visible / Make personal.
  • Delete — from the view’s row in the sidebar, confirmed with Delete saved view “<name>”?

Persistence

  • Work with tasks — creating, triaging, and moving the tasks these views show.
  • Task statuses — what the sections and columns mean.
  • Set up a project — a project’s page carries the four layouts and query bar, scoped to the project.